24.11.2014

GOTAVERKEN B&W K-90 GF ENGINE - STARTING AIR VALVE REPLACEMENT AND OVERHAUL

Gotaverken B&W K-90 GF Engine - Starting Valve Replacement and Overhaul

Format avi
Duration                   15 min
Size 220 Mb

- - - - - - download - - - - - -

   This introductory video film will be very useful for crew members dealing with the everyday operation and maintenance of Gotaverken - B&W marine diesel engines. It shows step by step actions for the replacement and periodical overhaul of the starting valve of the subject engine. The official release by the manufacturer. It would be very good to use the instruction book for the Gotaverken B&W K-90 GF for reference when watching this instruction film. In general, the process should consist of the following four steps: A - Stop the engine, B - Block the starting mechanism, C - Connect the turning gear, and D - Open the display cocks...

1184 Viewing 0 Comments
Read also
Total Comments: 0
avatar
Enter the site
Read Later

    The "Read Later" function allows you to add material to this block with just one click. Just click on the icon and read the articles that interest you at any convenient time.

Top Posts
Rate my site
Copyright MyCorp 2017