MOORING SYSTEM INSTALLATION AND SSDU INSTALLATION INTO PRE—LAID MOORING SYSTEMS

Mooring System Instalation and SSDU Installation into Pre-laid Mooring

Format avi
Duration 4 min
Size 667 Mb
D O W N L O A D

 

 

 

 

This file is intended to describe in detail the whole process of the installation of mooring system and SSDU, i.e. semi-submersible drilling unit. Its content is expected to be practical to the offshore workers engaged in subject operations. Here is an excerpt from the information contained at the slides...

Mooring system installation procedure - Anchor and pendant buoys stored on board MPSV1 and MPSV2. Mooring line arrangement. The MPSV1 is pulling the wire to put on the stopper. MPSV1 release the chain and connecting to the wire. The MPSV2 is pulling the chain to put on the stopper connecting the wire to the anchor. release the chain and connecting to the anchor.

The anchor is pulled to the stern. The anchor is lowered to the seabed. The MPSV's is pulling the anchor to just above the sea-bed target position. Landing of the anchor at the e-bed target position. MPSV2 is releasing the tension in pendant wire and connecting the pendant buoy. ..

4872 Viewing 0 Comments
Read also

Total Comments: 0
avatar
Enter the site
Read Later

    The "Read Later" function allows you to add material to this block with just one click. Just click on the icon and read the articles that interest you at any convenient time.

Top Posts
Rate my site